Mount the adapter and i/o base – Rockwell Automation 1738-AENT, Series B ArmorPOINT I/O Dual Port EtherNet/IP Adapters User Manual User Manual

Page 20

Advertising
background image

10

Rockwell Automation Publication 1738-UM005A-EN-P - July 2013

Chapter 2 Install Your ArmorPOINT I/O Adapter

Mount the Adapter and I/O
Base

To mount the adapter on a wall or panel, use the screw holes provided in the
adapter. A mounting illustration for the adapter with several attached I/O bases is
shown below.

Mounting illustration for the ArmorPOINT adapter and I/O Mounting bases

Install the adapter and its I/O mounting base as follows:

1. Lay out the required points as shown above in the drilling dimension

drawing.

2. Drill the necessary holes for M4 (#8) machine or self-tapping screws.
3. Mount the adapter using M4 (#8) screws.
4. Ground the system using the ground lug connection in the adapter’s I/O

Mounting base. (The ground lug connection is also a mounting hole).

5. Add one or more I/O modules and their respective I/O Mounting bases to

the adapter and its I/O Mounting base as required. See

Install the

ArmorPOINT I/O Modules

on

page 11

for details.

6. Mount the terminating base shipped with the adapter as the last base in the

backplane instead of the I/O Mounting base shipped with the I/O
module.

43769

52 mm
(2.05 in)

52 mm
(2.05 in)

52 mm
(2.05 in)

20 mm
(0.79 in)

20 mm
(0.79 in)

56 mm
(2.20 in)

Adapter

46.2 mm
(1.82 in)

102 mm
(4.02 in.)

43787

Mounting hole

Ground lug connection

Keyswitch

Latching
mechanism hole

Terminating Base

Latching mechanism

Advertising