Power supply, Sqe test setting, Connecting devices – Rockwell Automation 1785-TR10B2 Coax Transceiver for 10BASE2 Installation Instructions User Manual

Page 3: For additional information

Advertising
background image

1785-5.18 - January 1999

Coax Transceiver for 10BASE2

3

Power Supply

The operating voltage (+12 V) is taken from the connected device via the
15-pin sub-D socket of the AUI interface.

SQE Test Setting

The slide switch located on the top of the transceiver case is used to activate
and deactivate the SQE test. Before placing the transceiver in operation, you
should check to see whether the connected device requires the SQE test to
be on or off. As delivered from the factory, the SQE test is on.

Connecting Devices

For Additional Information

For standards information, go to

http://www.ieee.org/

. To download a .PDF

copy of this publication, go to

http://www.theautomationbookstore.com/

.

Connecting two devices

Connecting more than two devices

PC

PLC5E

PLC5E

PLC5E

PC

Terminator

Terminator

Terminator

BNC-T-Adapter

BNC-T-Adapter

10BASE2 (max. 185 m *)

10BASE2 (max. 185 m *)

1785-TR10B2

1785-TR10B2

* The maximum length is valid between the PC and the terminator.

* The maximum length is valid between the PC and the terminator.

mi

n. 0.5 m

Advertising