Wiring the base block – Rockwell Automation 1751 SynchLink Base Block Installation Instructions User Manual

Page 6

Advertising
background image

6 SynchLink Base Block

Publication 1751-IN001A-EN-P - March 2001

4. Use a screwdriver to move the locking tab down while you press the base

block flush onto the DIN rail. Release the locking tab to lock the base block
into place. If necessary, push up on the locking tab to lock the base block
into place.

5. Once you attach the base block to the DIN rail, slide the base block to the

left.

The total number of 4-port splitters that can be attached to the base block
cannot exceed four.

6. Connect the block wiring as shown in Wiring the Base Block.

Wiring the Base Block

To wire the base block and connect power:

1. Connect pre-terminated fiber optic cable to the fiber optic connector shown

in Figure 1. That is, connect RxIN to SynchLink station transmitter, TxIN.

ATTENTION

!

Be certain that you secure the base block and 4-port
Splitter blocks together with DIN rail anchors. Failure to
do so may result in loss of communication and/or
damage to blocks.

Failure to use the DIN rail interlocks in hazardous
location installations could cause an explosion.

IMPORTANT

If you exceed the base block’s power limit, you may
cause damage to the base block.

ATTENTION

!

Do not look directly into the fiber ports or fiber cables. Light
levels may cause damage to eyesight.

Advertising