Rockwell Automation 2711-NP2 Mounting Clips for PanelView 600, 900, 1000 Terminals User Manual
Page 3
Advertising
![background image](/manuals/579991/3/background.png)
Variable Content
TTL:Chap
Is Linked To HD:Running
3
2. Alternately tighten the mounting clips screws to a torque of 10 inch-pounds.
Do not over-tighten the clips.
!
ATTENTION:
Tighten mounting clips to a torque of 10 inch-pounds
to provide a proper seal and to prevent damage to the terminal.
Allen-Bradley assumes not responsibility for water or chemical damage
to the terminal or other equipment within the enclosure because of
improper installation.
!
ATTENTION:
Remove the protective installation label covering the
top vents to prevent overheating and damage to the terminal.
3. Remove the protective label covering the top vents of the terminal.
Advertising