Ground bus linking, Figure 28 – Rockwell Automation 7763 OneGear MV SMC Flex Solid-State Motor Controller User Manual
Page 30
Advertising

28
Rockwell Automation Publication 7760-IN001
B-EN-P - June 2013
Chapter 3
Equipment Installation
Figure 28 - Installation of SMC Barriers (cutaway view)
Ground Bus Linking
Connect the supplied links from the converter cabinet ground bus to the
switchgear cabinet ground bus, as shown in
(typical both sides). Fasten
Figure 29 - Installation of Ground Bus Link (cutaway view)
Mounting Provision
Barrier 2
Barrier 1
Ground Bus Link
Ground Bus Link
Advertising
This manual is related to the following products: