Rockwell Automation 2755 I-O Module Board and Connector User Manual

Page 4

Advertising
background image

Bulletin 2755 I/O Module Board and Connector

4

4. Remove I/O Connector and parts from the package.

5. Slip the rubber washer over the wires and down over the threads

to the flange on the connector.

6. Insert the wire end of the connector into the I/O module wiring

hole of the decoder until the washer and connector flange are
seated against the outside of the enclosure.

7. Slip the lock nut over the end of the wires and tighten the lock nut

to a torque of 70-100 in-lbs while holding the connector.

!

ATTENTION: Torque the lock nut only. Do not
torque the connector itself.

Repeat steps 3 - 7 for the second connector, if required.

Advertising