Rack mounting, Table 8 - panel rack adapters, Required tools – Rockwell Automation 6186M-xxxx Industrial Performance Monitors User Manual User Manual
Page 28: Mounting guidelines, Mounting the monitor in a rack

28
Rockwell Automation Publication 6186M-UM002B-EN-P - March 2012
Chapter 2
Installing the Monitor
Rack Mounting
You can install the 1200M, 1500M, and 1700M monitors directly into an
EIA-rack cabinet by using the appropriate rack adapters.
Required Tools
You need the optional rack-adapter kit and a #2 Phillips screwdriver.
Mounting Guidelines
Observe these guidelines when installing the monitor in an EIA-rack cabinet:
• The height of the cabinet must accommodate the monitor’s panel height.
• The depth of the cabinet must accommodate the monitor’s depth plus rear
clearance for cables and airflow. A cabinet depth of 112 mm (4.4 in.) is
sufficient.
Mounting the Monitor in a Rack
Follow these directions to mount the monitor in a rack.
1. Place the 1200M, 1500M, or 1700M monitor in the rack adapter (1) and
attach it to the rack adapter with the mounting clips provided (
2).
Table 8 - Panel Rack Adapters
Cat. No.
Description
6189V-MRA12
Rack adapter for 1200M monitor
6189V-MRA15
Rack adapter for 1500M monitor
6189V-MRA17
Rack adapter for 1700M monitor