Rockwell Automation GV3000 Precharge Board Replacement Instructions - AC Input, Frames 5 and 6 User Manual

Frame 5, Installation instructions, L1 l2 l3

Advertising
background image

Installation Instructions

Optional

Communications

Module

L2

L1

T3

T2

T1

L3

INPUT

OUTPUT

USE 75 C

COPPER WIRE

ONLY

TORQUE
52 IN-LB

(6 N-M)

BR2

PS+

PS–

BR1

DC+

DC–

USE 75 C COPPER WIRE ONLY, TORQUE 52 IN-LB (6 N-M)

22-10
AWG

5.3 IN-LB
(0.6 N-M)

WIRE STRIP

2

0V

0V

DC–

DC+

3

WIRE RANGE: 14-1/0 AWG (2.5-35 MM

2

)

TORQUE: 32 IN-LB (3.6 N-M)
STRIP LENGTH: 0.67 IN (17 MM)
USE 75 C CU WIRE ONLY

POWER TERMINAL RATINGS

WIRE RANGE: 6-1/0 AWG (16-35 MM

2

)

TORQUE: 44 IN-LB (5 N-M)
STRIP LENGTH: 0.83 IN (21 MM)

GROUND TERMINAL RATINGS (PE)

300 VDC EXT PWR SPLY TERM (PS+, PS-)

WIRE RANGE: 22-10 AWG (0.5-4 MM

2

)

TORQUE: 5.3 IN-LB (0.6 N-M)
STRIP LENGTH: 0.35 IN (9 MM)

17

21

INPUT AC

OUTPUT

Optional

Communications

Module

9

A

B

Precharge Board Replacement – AC Input Drives, Frames 5 & 6

1

L1

L2

L3

O

I

=

A. Remove the two screws securing the

plastic shield.

B. Loosen the screw that secures the fan

assembly (located between the terminal
blocks, see figure).

C. Slide the Precharge Board assembly out

slightly to gain access to the board and
connectors.

D. Disconnect ground wire and remove the

three connectors. Note connector
location and orientation.

E. Remove board.

F. Install new board in reverse order. All

screws should be tightened to 3.2 N-m
(28 lb.-in.).

Frame 5

Advertising
This manual is related to the following products: