Ndex – Rockwell Automation SB3000 High Pwr SB3000 AC Pwr Modules (RCS) User Manual

Page 81

Advertising
background image

Index

Index-1

I

NDEX

A

AC input current meter, 2-2

B

Bridge test, D-1 to D-2

C

Cabinet installation, 3-5 to 3-9

double-bay cabinet (890A unit), 3-7
power and ground connections, 3-9
single-bay cabinet (445A unit), 3-6
triple-bay cabinet (1335A unit), 3-8

Cabinet replacement, 4-21 to 4-22
Capacitor bank assembly, 2-2
Components, 2-1 to 2-5

1335A power module, 2-5
445A power module, 2-3
890A power module, 2-4

Configurations, 1-1
Control structure, B-4

D

DC bus current meter, 2-2
DC bus voltage, 2-6
DC bus voltage meter, 2-2
Diagnostics and troubleshooting, 4-1 to 4-22

DC bus and output terminal tests, 4-4
DC bus voltage measuring points, 4-3
faults and warnings, 4-4 to 4-10
IGBT tests, 4-4
replacing fuses and sub-assemblies, 4-10 to

4-21

replacing the cabinet, 4-21 to 4-22
required test equipment, 4-1 to 4-2
tests with input power off, 4-2 to 4-4

E

Electrical description, 2-6 to 2-11

1335A power module circuitry, 2-11
445A power module circuitry, 2-9

890A power module circuitry, 2-10
Drive I/O and processor card, 2-8

F

Fault register 202/1202, 4-5
Faults, 4-5 to 4-7

charge fault, 4-6
communication lost, 4-7
DC bus overcurrent, 4-6
DC bus overvoltage, 4-6
gate driver interface fault, 4-6
ground current fault, 4-6
instantaneous overcurrent, 4-6
local power interface fault, 4-6
overtemperature, 4-7
PMI power supply fault, 4-7
PMI read/write fault, 4-7
power loss, 4-7
power technology fault, 4-7
UDC run fault, 4-7

Fiber-optic communication, 2-1
Fuses, 3-2 to 3-3, 4-10 to 4-16

1335A power module fuse locations, 4-14
15V and 24V power supplies, 4-15
25KHz power supply, 4-16
445A power module fuse locations, 4-12
890A power module fuse locations, 4-13
replacement fuse specifications, 4-11
replacing fuses, 4-10 to 4-16

G

Grounding, 3-5, 3-9

I

Installation guidelines, 3-1 to 3-9

cabinet installation, 3-5 to 3-9
control transformers, 3-3 to 3-4
grounding, 3-5
installation planning, 3-1
line reactors, 3-3
pre-charge resistors and fuses, 3-2 to 3-3
terminal tightening torques, 3-4

Advertising