Rockwell Automation 20B Power Bd/CT/Thermistor Replacement - Frame 5 User Manual
Installation instructions
Advertising
Installation Instructions
Optional
Communications
Module
L2
L1
T3
T2
T1
L3
INPUT
OUTPUT
USE 75 C
COPPER WIRE
ONLY
TORQUE
52 IN-LB
(6 N-M)
BR2
PS+
PS–
BR1
DC+
DC–
USE 75 C COPPER WIRE ONLY, TORQUE 52 IN-LB (6 N-M)
22-10
AWG
5.3 IN-LB
(0.6 N-M)
WIRE STRIP
2
0V
0V
DC–
DC+
3
Current Transducer/Power Interface Board and
Thermistor Replacement - Frame 5
1
L1
L2
L3
O
I
=
A. Remove front panel.
B. Remove the HIM Support Plate by taking out the six
screws. Label and remove cables.
C. Locate component(s) to be replaced.
HIM Support Plate
Remove Screws
(6 Places)
Power Interface Board
Current Transducers
Thermistor
Advertising