Pipefitting project keys – Calculated Industries 4095-B User Guide User Manual
Page 12

12 —
P
IPE
T
RADES
P
RO
™
Pipefitting Project Keys
Travel
Slope
Of
fset
Angleº
Enters or calculates a linear Slope, Slope Angle,
or Percent Grade. The linear slope is the amount
of "Offset" over 12 inches of "Run." Values may be
entered as:
●
a Dimension:
●
an Angle or Degrees:
●
a Percentage (percent grade):
Once an angle or slope has been entered, consec-
utive presses of
will convert to the remaining
formats listed above.
Take-Out (T.O./Arc) – Used to enter or solve fit-
ting Take-Outs when calculating pipe cut lengths.
Calculates inner, center, and outer arc lengths for
marking field cut fittings.
Calculates or enters the Offset (Rise).
Welder's Gap – Defines the Welder's Gap sub-
tracted from the end to end pipe length calculation.
Default value is 1/8", 0 is a valid value.
Enters or calculates the Run.
Enters or calculates the Travel (Diagonal).