3 flow diagram, Flow diagram – Metrohm 850 Professional IC Anion User Manual

Page 20

Advertising
background image

2.3 Flow diagram

■■■■■■■■■■■■■■■■■■■■■■

10

■■■■■■■■

850 Professional IC – Anion

8 Install sample path connections.

Connect the sample degasser (if required) (see Chapter 2.13,
page 39)
.

Connect sample path connections to the injection valve (see
Chapter 2.14.2, page 41)
.

9 Installing the MSM (see Chapter 2.16, page 46) – with associated

peristaltic pump (see Chapter 2.17, page 49).

10 Connect detector capillaries .

11 Mains connection (see Chapter 2.19, page 56).

12 Connect the instrument to the PC (see Chapter 2.19.1, page 56).

13 Initial start-up (see Chapter 3.1, page 61).

14 Install the guard column (if used) (see Chapter 2.20, page 57).

15 Install the separation column (see Chapter 2.21, page 59).

2.3

Flow diagram

Figure 2 Flow diagram with chemical suppression shows the flow paths
with the application of chemical suppression (MSM (2-9)). The arrange-
ment of the parts corresponds to the front view of the instrument. Liquid
containers (eluent bottle, sample vessel, waste container) and guard col-
umn (see Chapter 2.20, page 57) are not shown in the diagram. Which
pressure screws, connections and couplings are used, is described in the
installation chapters of the individual modules.

Advertising