4 appendix – Metrohm 797 VA Computrace User Manual
Page 124

4 Appendix
797 VA Computrace / Hardware-Manual 8.797.8001EN
116
823 Membrane Pump Units
Ordering designation..............111
838 Advanced Sample Processor
Brightener determination MLAT66
Brightener determination with
MLAT .......................................63
Complete system ......................56
Delivery option .......................111
Pipetting needle adjustment .....57
Suppressor determination.........60
Tubing connections for the rinsing
equipment................................56
846 Dosing Interface ....................40
Ordering designation..............102
Adapter cable
..................110, 112
Ag electrode tip (6.1204.130)34, 100
Ag/AgCl filling 104
Figure.......................................36
Ag/AgCl reference system, see
Reference system .........89, 103, 105
Ambient temperature ...................87
Appendix......................................83
Application Notes.........................11
Application-Bulletins.......................9
Au electrode tip (6.1204.140)34, 100
Au electrode tip (6.1204.150)34, 100
Automation for electroplating bath
analysis ......................................111
Automation for trace analysis.....110
Auxiliary electrode 43
Construction.............................38
Electrical connection.................38
Figure...................................5, 35
Insertion in measuring head17, 38
Installation ...............................38
Startup procedure ....................38
Auxiliary electrode43
Figure.......................................39
Technical Data..........................85
Auxiliary solution
Accessories for the automated
addition..................................109
Bottle holder
Ordering designation..............109
Bridging electrolyte ......................37
Brightener analysis
automated ...............................56
Brightener determination of with LAT
Tubing connections at the
measuring head........................67
Brightener determination with LAT
Electrical connection.................66
Tubing connections ..................66
Brightener determination with MLAT
Electrical connection.................62
System description ...................62
Tubing connections ..................63
Tubing connections at the
measuring head........................65
Cabinet temperature ....................77
Cable
(6.2134.030)
Ordering designation .......102
(6.2141.170)
Ordering designation .......111
(6.2151.020)
Figure.................................13
6.2134.030
Connection Dosimat 685....40
6.2151.010 ..............................40
Cable (6.2151.020)
Installation ...............................13
Capillary...............see Glass capillary
Caution.......................................... 8
CE Zeichen................................. 115
Changing capillary ....................... 29
Check of instrument .................... 12
Cleaning the MME ....................... 31
Collecting mercury ....................... 79
Combined system
Electrical connection ................ 57
Tubing connections.................. 57
Tubing connections at the
measuring head ....................... 59
Comment ...................................... 8
Communication diagrams for
automation.................................. 69
Connection
766 Sample Processor.............. 54
813 Compact Autosampler ...... 46
838 Advanced Sample Processors
................................................ 55
Dosing devices......................... 40
MSB..................................... 3, 86
Remote................................ 3, 86
to PC ......................................... 3
USB...................................... 3, 86
Connection 71
for inert gas supply
Attachment of FEP tubing 34
......................................... 17
Inert gas connection scheme19
Connection 72
for inert gas supply
Attachment of FEP tubing 42
......................................... 17
Inert gas connection scheme19
Connection for inert gas lead off 9
Attach lead off tubing.............. 18
Connection for inert gas lead-off 9
Figure ........................................ 3
Connection for inert gas supply 11
Figure ........................................ 3
Connection for inert gas supply 71
Figure ...................................... 21
Connection for inert gas supply 72
Figure ...................................... 21
Connection for optional waste
solution lead-off 10
Figure ........................................ 3
Connection to the PC................... 13
contact pin 80
Figure ...................................... 21
Content .......................................... I
Control lines ................................ 68
Cover 2 of measuring head arm
Figure ........................................ 2
Current measurement .................. 84
De-aeration of analyte solution.... 18
Declaration of Conformity.......... 115
Depth .......................................... 88
Diaphragm support 106
Figure ...................................... 36
Diaphragm107
Figure ...................................... 36
Diaphragm110
Figure ...................................... 36
Dimensions .................................. 88
Dispose of mercury ...................... 80
DME ............................................ 20
Dosimat 685
Connection
Cable 6.2134.030 ..............40
Dosimat 685 ................................86
Connection cable ...................102
Ordering designation..............102
Dosimat 805 ................................86
Connection...............................40
Ordering designation..............102
Dosing devices .......................40, 86
Addition of standard solutions .41
Electrical Connection ................40
Tubing connection ...................41
Dosing Interface...........................40
Dosing unit ..................................40
807 (6.3032.XXX)
changing............................44
Ordering designation .......103
change.....................................44
Dosino 700 ..................................86
Connection...............................40
Ordering designation..............102
Dosino 800 ..................................86
Connection...............................40
Ordering designation......102, 109
Drip pan 8 (6.2711.040)
Figure.........................................2
Ordering designation....92, 95, 99
Setting up ................................12
Drip pan 91 (6.2711.030)
Figure.................................22, 26
Drip pan 91(6.2711.030)
Ordering designation................92
Drive belt 32 (6.1244.020)
Figure...................................5, 35
Installation .........................15, 39
Ordering designation..........90, 97
Drive shaft 99 (6.1246.000)
Construction of RDE .................34
Figure.......................................35
Insertion in measuring head .....15
Drive wheel 35
Figure.........................................5
Installing the drive belt 32 ..15, 39
Drive wheel35
Figure.......................................35
Dummy cell ..................................86
Dummy cell connection ”AE” 52
Figure.........................................6
Dummy cell connection ”RE” 51
Figure.........................................6
Dummy cell connection ”WE-D” 49
Figure.........................................6
Dummy cell connection ”WE-L” 50
Figure.........................................6
Dummy stopper 25 (6.1446.040)
Figure.........................................5
Ordering designation..........91, 97
Dummy stopper 25(6.1446.040)
Ordering designation................94
Dummy stopper 44 (6.1446.040)
Figure.........................................5
Insertion in measuring head .....14
Ordering designation..........91, 94
Dummy stopper 44(6.1446.040)
Ordering designation................97
Dummy stopper 45 (6.1446.040)
Figure.........................................5
Insertion in measuring head .....14
Ordering designation................94
Dummy stopper 45(6.1446.040)
Ordering designation..........91, 97
Electrical connection 102
Figure.......................................36