Figure 20, Deaerating the high pressure pump – Metrohm 850 Professiona IC Cation Prep 1 User Manual

Page 48

Advertising
background image

2.10 High pressure pump

■■■■■■■■■■■■■■■■■■■■■■

38

■■■■■■■■

850 Professional IC –Cation – Prep 1

Deaerating the high pressure pump

The instrument must be connected to the PC and switched on to deaerate
the high pressure pump.

5

1

2

6
7

5

3

4

5

Figure 20

Deaerating the high pressure pump

1

Syringe 10 mL 6.2816.020
For aspirating the eluent.

2

Luer connector
On purging needle.

3

Purging needle 6.2816.040

4

Deaerating capillary

5

PEEK pressure screws, short
6.2744.070

6

Purge valve

7

Purge valve rotary knob

1 Connecting the purging needle

Push the end of the purging needle (20-3) over the end of the
deaerating capillary (20-4)
on the purge valve.

2 Connecting the syringe

Insert syringe (20-1) in the Luer connector (20-2) of the purging
needle (see Figure 20, page 38).

3 Opening purge valve

Open the rotary knob (20-7) by approx.

½ rotation counterclock-

wise.

Advertising