Screen sequence, Operator run screen – GBC Auto 50 MBM Crease User Manual

Page 17

Advertising
background image

Screen Sequence.


On switching on the machine the KAS logo will be displayed for a few seconds, this is to
allow the main processor to power up. When this has completed its procedure the first
screen will be displayed.

Operator Run Screen


The Operator Run Screen will be displayed under normal run conditions.
The screen shows us various pieces of information about the job being run at the time. It
consists of four lines, and is controlled by the six buttons to the right of the screen. These
buttons consist of UP, DOWN, LEFT, RIGHT, TICK and X.

Line 1 displays the speed that the machine is currently set to run at in the top left hand
corner. This may only be altered while the machine is at rest by pressing the UP and
DOWN arrows.
In the top right hand corner is the START prompt. To start the machine the green TICK
is pressed.

Line 2 consists of ABSOLUTE and INCREMENTAL measuring. The LEFT arrow is
used to switch between the two.
The RIGHT arrow is used to run a single sheet test. With the machine running, each time
the RIGHT arrow is pressed a test sheet will be sent through the machine. This allows the
operator to adjust the crease and perforation position before starting the main run.

Line 3 shows us the JOB number or program being run and the number of sheets that
have been completed using that job number.

Line 4 has the SETUP prompt. Pressing the red X button takes us to the job selection
screen.

17

Advertising