07 torch connections – Tweco 50 CutMaster User Manual

Page 17

Advertising
background image

Manual 0-2805

3-5

INSTALLATION

E. Using High Pressure Gas Cylinders

Refer to the following when using high pressure gas cyl-
inders as the gas supply:

CAUTION

Pressure should be set at 100 psi (6.9 bar) at the
high pressure gas cylinder regulator.

1. Refer to the manufacturer’s specifications for in-

stallation and maintenance procedures for high
pressure gas regulators.

2. Examine the cylinder valves to be sure they are

clean and free of oil, grease or any foreign mate-
rial. Momentarily open each cylinder valve to
blow out any dust which may be present.

3. The cylinder must be equipped with an adjust-

able high-pressure regulator capable of outlet
pressures up to 100 psi (6.9 bar) maximum and
flows of up to 200 scfh (94.3 lpm).

4. Use customer-supplied fitting(s) to connect 1/4"

(6 mm) inside diameter gas supply hose to the
cylinder.

NOTE

Supply hose must be at least 1/4 inch (6 mm) I.D.
For a secure seal, apply thread sealant to the fit-
ting threads, according to manufacturer's instruc-
tions. Do Not use Teflon tape as a thread sealer as
small particles of the tape may break off and block
the small gas passages in the torch.

3.07 Torch Connections

Equipment ordered as a system will have the Torch fac-
tory connected to the Power Supply.

The instructions for connecting the Torch Leads to the
Power Supply are different depending on the type of
leads. This sub-section covers connecting the Torch for
the following applications:

A. Hand Systems

B. Machine Systems (Unshielded Leads)

C. Remote Pendant Control (Optional)

The Torch Leads must be properly installed to the Power
Supply for proper operation. If the torch leads were not
factory-installed, make all torch connections to the Torch
Bulkhead Panel for the desired application.

A. Hand Systems

WARNING

Disconnect primary power at the source before dis-
assembling the torch or torch leads.

1. Remove the Cover of the Power Supply for ac-

cess to the Torch Bulkhead Panel. See Section 5.05.

2. Remove the retaining nut from the Strain Relief.

Strain Relief

Nut

Strain Relief

Torch Leads

Assembly

A-03607

Negative /
Plasma Lead

Pilot Lead

Retaining Nut Removal

3. Feed the torch lead ends and the Strain Relief into

the hole in the unit.

4. Secure the Strain Relief with the retaining nut re-

moved earlier.

5. Connect the torch Negative / Plasma Lead to the

bulkhead connection inside the Power Supply.

Advertising