Tweco 50 CutMaster User Manual

Page 18

Advertising
background image

INSTALLATION

3-6

Manual 0-2805

Pilot Lead

Torch Lead

Assembly

Negative/Plasma

Lead

Adapter

Connector

Pilot Lead Stud

Negative/Plasma
Lead Connection

A-03608

Note: Actual Bulkhead
configuration may
differ from that shown.

Adapter

Control Circuit

Connectors

Torch Lead Connections To Bulkhead

6. Connect the Control (PIP) Circuit Connectors to

the mating connectors on the Power Supply
Adapter.

7. Remove the top nut and washer from the Pilot

Stud.

8. Place the lug on the Pilot Control Wire onto the

stud and secure with the nut and washer removed
in Step 7.

9. Tighten the Strain Relief onto the Torch Leads.

10. Check the torch for proper parts assembly.

CAUTION

The torch parts must correspond with the type of
operation. Refer to the appropriate torch manual
for proper parts selection.

11. Re-install the Power Supply Cover on the Power

Supply.

B. Machine Systems (Unshielded Leads)

1. Remove the Cover of the Power Supply to gain

access to the Torch Bulkhead Panel. See Section
5.05.

2. Remove the strain relief nut from the Strain Re-

lief.

Strain Relief

Nut

Strain Relief

Torch Leads

Assembly

A-03609

Remove Tie Wrap,
Remove Insulator,
Disconnect Wires

Strain Relief Nut Removal

3. The Adapter supplied with the Power Supply

must be installed as follows:

a. Inside the Power Supply Bulkhead area, route

the connector on the free end of the Adapter
through the Strain Relief Nut.

b. Continue routing the connector out the hole

in the front of the Power Supply.

c. Feed the end of the torch lead and the Strain

Relief into the hole in the unit while routing
the single black wire into the notch of the Strain
Relief.

d. Tighten the Strain Relief Nut to secure the

Strain Relief to the Power Supply.

4. Connect the torch Negative / Plasma Lead to the

bulkhead connection inside the Power Supply.

Advertising