03 sequence of operation, Sequence of operation -4, Cutskill 35a – Tweco 35A CutSkill User Manual

Page 22

Advertising
background image

cutskill 35A

OPERATION 4-4 Manual 0-5104

Gas Pressure Regulator/

Filter Assembly

Gas Pressure Gauge

Art # A-09408

Input Power
Cable

H. Select Current Output Level

Place RUN / SET switch to RUN (up) position. Gas flow will stop. Set the desired current output level.

Art # A-09181

RUN

SET

CURRENT (A)

15

25

35

READY

AIR

OVERHEAT

POWER

4.03 Sequence of Operation

The following is a typical sequence of operation for this power supply. Refer to Appendix 1 for block diagram.

1. Plug the input power cord into an active circuit.

a. AC power is available at the power supply.

2. Place the ON / OFF switch on the power supply to ON (up) position.

a. AC indicator

turns on; fan turns on.

NOTE

Gas will automatically flow from torch for 4 seconds, this is a safety circuit that makes sure the torch

tip is properly installed.

3. Set gas pressure.

a. Turn gas pressure adjustment knob to set pressure to 65 psi / 4.5 bar.

Advertising