INSTALLATION, OPERATION AND SETUP

Operation

With the regulator connected to cylinder or pipeline, and the adjustment screw/knob fully disengaged, pressurize

as follows:

1. Stand to one side of regulator and slowly open the cylinder valve. If opened quickly, a sudden pressure

surge may damage internal regulator parts.

2. With valves on downstream equipment closed, adjust regulator to approximate working pressure. It is

recommended that testing for leaks at the regulator connection points be carried out using a suitable

leak detection solution or soapy water.

3. Purge air or other unwanted welding grade shielding gas from equipment connected to the regulator

by individually opening then closing the equipment control valves. Complete purging may take up to

ten seconds or more, depending upon the length and size of the hose being purged.

Adjusting Flow Rate

Art: A-05088_AB

Figure 3-14: Adjust Flow Rate

With the regulator ready for operation, adjust working flow rate as follows:

1. Slowly turn adjusting screw/knob in (clockwise) direction until the outlet gauge indicates the required

flow rate.

NOTE

It may be necessary to re-check the shielding gas regulator flow rate following the first weld sequence

due to back pressure present within shielding gas hose assembly.

2. To reduce flow rate, allow the welding grade shielding gas to discharge from regulator by opening the

downstream valve. Bleed welding grade shielding gas into a well ventilated area and away from any

ignition source. Turn adjusting screw counterclockwise, until the required flow rate is indicated on the

gauge. Close downstream valve.

Shutdown

Close cylinder valve whenever the regulator is not in use. To shut down for extended periods (more than 30

minutes).

1. Close cylinder or upstream valve tightly.
2. Open downstream equipment valves to drain the lines. Bleed gas into a well ventilated area and away

from any ignition source.

3. After gas is drained completely, disengage adjusting screw and close downstream equipment valves.
4. Before transporting cylinders that are not secured on a cart designed for such purposes, remove

regulators.