Verifying the package contents – Cisco 3522 BRI User Manual

Page 23

Advertising
background image

2-5

Installation and Upgrade Guide for Cisco Unified Videoconferencing 3522 BRI Gateway and 3527 PRI Gateway Releases 5.6 and 5.7

OL-17010-01

Chapter 2 Setting Up Your Cisco Unified Videoconferencing 3500 Gateway

Verifying the Package Contents

•

Key Hold

•

ACO

Verifying the Package Contents

Procedure

Step 1

Inspect the contents of the box for shipping damage.

Step 2

Report any damage or missing items to your Cisco representative.

Step 3

Verify contents. See

Table 2-4

lists the package contents for the Cisco Unified

Videoconferencing 3500 Gateway unit.

Mounting the Cisco Unified Videoconferencing 3500 Gateway
Unit in a 19-inch Rack

You can optionally mount the Cisco Unified Videoconferencing 3500 Gateway unit in a standard
19-inch rack. Two mounting brackets and a set of screws are included in the Cisco Unified
Videoconferencing 3500 Gateway unit shipping box.

Procedure

Step 1

Disconnect all cables including the power cables.

Step 2

Place the Cisco Unified Videoconferencing 3500 Gateway unit right-side up on a hard flat surface, with
the front panel facing you.

Step 3

Position a mounting bracket over the mounting holes on each side of the Cisco Unified
Videoconferencing 3500 Gateway unit, as shown in

Figure 2-4

.

Table 2-4

Package Contents with Cisco Unified Videoconferencing 3500 Gateway

Unit

Product

Contents

Cisco Unified
Videoconferencing 3527 PRI Gateway or
Cisco Unified
Videoconferencing 3522 BRI Gateway unit

•

Cisco Unified Videoconferencing 3500 Gateway
Unit

•

Guide to Cisco Conferencing Documentation

•

Regulatory Compliance and Safety Information for
Cisco Unified Videoconferencing 3500 Products

•

Cisco Unified Videoconferencing Software
CD-ROM

•

Cisco Information Package

Advertising