Quoizel BWL2822CC Brown Lattice User Manual

Warnings and cautions, Package contents, Hardware contents

Advertising
background image

Quoizel, Inc.
6 Corporate Parkway
Goose Creek, SC 29445

Customer Service
Phone 631.273.2700
Fax

631.231.7102

www.quoizel.com

Tools Required: Flathead screwdriver, Phillips screwdriver, pliers, wire cutters, wire strippers, electrical tape,
safety glasses.

Estimated Assembly Time: 20-30 minutes
Preparation: Identify and inspect all parts before beginning installation. Check package content list and diagrams
below to be sure all parts are present. If any parts are missing or damaged, do not attempt to assemble, install, or
operate the fixture. Contact customer service for replacement parts.

Warnings and Cautions

1of2

Assembly Instruction Sheet #IS-BWL2822CC

For Style BWL2822CC

Bulb Recommended: (4) Medium Base 100W Maximum, Alternate bulb (4) 23W CFL

6 CORPORATE PARKWAY
GOOSE CREEK SC 29445
www quoizel com

,

.

.

.

Thank you for purchasing a Quoizel product.

Need assistance with parts or assembly? Call Quoizel customer service at 1-631-273-2700

or visit us on-line at www.quoizel.com

2014 QuoizelInc.

Turn off electricity at circuit breaker or main fuse box before installation. Consult a licensed electrician if in doubt.

These instructions are provided for your safety. It is very important you read them completely before installing the fixture. We strongly
recommend that a licensed, professional electrician perform the installation.

Disconnect fixture from power source before replacing bulbs. Make sure bulbs are given sufficient time to cool before removal. Do not subject
glass parts to any shock while in operation or shattering may result.

Package Contents

A

Hardware Contents

Ceiling
Canopy
x 1

AA

Crossbar Assembly
x 1

Care of Tiffany Style Shade

A new tiffany lamp shade has an oil film applied to the shade that protects the tiffany shade from scratches during shipment. If the oil applied is
too heavy you can remove the excess oil film with a paper towel. Gently wipe away the excess oil.

For general cleaning of tiffany shades use a gentle lemon oil-based furniture polish applied to a soft cloth and wipe gently.

If a white powder appears on the soldered joints of the tiffany shade this is a normal oxidation process. Use a small amount of lemon oil or
mineral oil applied directly to oxidized areas and the soldered area will return to like new.

I

Diffuser
x 1

B

Lock Ball
x 2

F

Shade
x 1

C

6” Rod
x 2

E

12” Rod

x 1

with Nipple

J

Hex Nut
x 1

STEP 1

Assemble Rods

-

A. Determine the Rods (C/D/E) to

be assembled to the Shade (F)
according to your hanging
height.

B. Pass Supply Wires and Ground

Wire through the chosen Rods
(C/D/E) and then thread the
chosen Rods (C/D/E) and
Shade (F). Hand tighten until
snug.

C. Pass Supply Wires and Ground

Wire through the Ceiling
Canopy (A) and then thread the
Ceiling Canopy (A) and the
Upper Rod together. Hand
tighten until snug.

C

D

A

F

Figure 1

STEP 2

Install Crossbar

-

.

.

A. Attach the Crossbar Assembly (AA) to the Outlet Box with the head

of the Green Ground Screw facing you. Secure it with Outlet Box
Screws (not included)

Tighten until snug

Figure 2

Outlet Box

Outlet Box Screw
(not included)

Green Ground Screw

AA

STEP 3 - Attach Lanyard

A. The purpose of the lanyard is to provide the installer a means to

support the fixture from the junction box while connecting the
electrical wires. This enables the fixture to hang from the junction
box and your hands are free to make the wire connections.

B. Turn the Button Stop so it may be inserted into the Inner Backplate

slot. Make sure the Button Stop is completely inside the crossbar.
Slowly release the fixture to make sure it is supported by the Button
Stop. Proceed to the wiring steps. Once you are complete with the
wiring there is nothing to do with Lanyard. The Lanyard will push
into the junction box when the fixture is placed for final mounting.

D

12” Rod
x 1

K

Finial
x 1

C

E

G

H

Rubber Washer
x 1

GND

Flat Washer
x 1

Button Stop
Lanyard

Crossbar

February2014

Figure 3

Advertising