Quoizel QF1402CMU Quoizel Fixture User Manual

Warnings and cautions, Package contents, Hardware contents

Advertising
background image

Tools Required: Flathead screwdriver, Phillips screwdriver, pliers, wire cutters, wire strippers, electrical tape, safety glasses.
Bulb Recommended:
Estimated Assembly Time:
Preparation:

(4) Candelabra Base 60W Maximum.

30-45 minutes

Identify and inspect all parts before beginning installation. Check package content list and diagrams below to be sure all parts are

present. If any parts are missing or damaged, do not attempt to assemble, install, or operate the fixture. Contact customer service for replacement
parts.

Warnings and Cautions

1of2

Assembly Instruction Sheet #IS-QF1402

For Style QF1402CMU and QF1402CBN

6 CORPORATE PARKWAY
GOOSE CREEK SC 29445
www quoizel com

,

.

.

.

Thank you for purchasing a Quoizel product.

Need assistance with parts or assembly? Call Quoizel customer service at 1-631-273-2700

or visit us on-line at www.quoizel.com

2014 QuoizelInc.

Turn off electricity at circuit breaker or main fuse box before installation. Consult a licensed electrician if in doubt.

These instructions are provided for your safety. It is very important you read them completely before installing the fixture. We strongly
recommend that a licensed, professional electrician perform the installation.

Disconnect fixture from power source before replacing bulbs. Make sure bulbs are given sufficient time to cool before removal. Do not subject
glass parts to any shock while in operation or shattering may result.

Package Contents

B

Hardware Contents

Fixture
Body
x 1

Fixture
Loop
x 1

AA

BB

CC

DD

EE

FF

II

Crossbar
x 1

Lock Washer
x 2

Hex Nut
x 2

Nipple
x 1

Canopy
Chain Loop
x 1

Canopy Lock
Ring
x 1

Ceiling
Canopy
x 1

GG

Fixture Chain
x 1

HH

Quick Link
x 2

A

STEP 1

Install Crossbar

-

A.

AA)

Attach the Crossbar (

to the Outlet Box with the head of the

Green Ground Screw facing you. Secure it with Outlet Box Screws
(not included)

Tighten until snug

.

.

Figure 1

Outlet Box

Outlet Box Screw
(not included)

Green Ground

Screw

AA

another Lock Washer (BB) over the Nipple (DD) and then thread the
Nipple (DD) into the Crossbar (AA) until the Nipple (DD) is about
0.375” above the Crossbar (AA).

C. Remove the Canopy Lock Ring (FF) from the Canopy Chain Loop

(EE). Place the Ceiling Canopy (II) over the Canopy Chain Loop (EE)
against the ceiling to determine the correct position of the Nipple
(DD). Thread the Canopy Lock Ring onto the Canopy Chain Loop
(EE). Adjust the Nipple (DD) to allow the Ceiling Canopy (II) to rest
against the ceiling when held in place by the Canopy Lock Ring (FF).

D. Remove the Canopy Lock Ring (FF) and the Ceiling Canopy (II).

Tighten the Hex Nut (CC) against the Crossbar (AA) to secure in
place.

August2014

AA

BB

CC

Step B

Step A

DD

CC

BB

EE

II

FF

Figure 2

STEP 2

Install Canopy Chain Loop and Nipple

-

* Pliers is required for this step.

A. Thread one Hex Nut (CC) to one end of the Nipple (DD) until it is at

least 0.25” from the end. Pass one Lock Washer (BB) over the end of
the Nipple (DD) and thread the Canopy Chain Loop (EE) onto the
Nipple (DD). By using pliers, thread the Hex Nut (CC) against the
Canopy Chain Loop (EE) and hand tighten until snug.

B. Thread another Hex Nut (CC) to the middle of the Nipple (DD). Place

STEP 3

Install Fixture Loop to

Fixture Body

-

A. Unfold support arms on fixture

assembly to proper locations.

B. Thread Fixture Loop (A) on to the

Nipple on the top of Fixture Body
(B). Tighten until snug

.

Figure 3

A

B

Nipple

Advertising