Quoizel MCRM2816PN Ruckman User Manual

Warnings and cautions, Package contents, Hardware contents

Advertising
background image

Quoizel, Inc.
6 Corporate Parkway
Goose Creek, SC 29445

Customer Service
Phone 631.273.2700
Fax

631.231.7102

www.quoizel.com

Tools Required: Flathead screwdriver, Phillips screwdriver, pliers, wire cutters, wire strippers, electrical tape,
safety glasses.

Estimated Assembly Time: 20-30 minutes
Preparation: Identify and inspect all parts before beginning installation. Check package content list and diagrams
below to be sure all parts are present. If any parts are missing or damaged, do not attempt to assemble, install, or
operate the fixture. Contact customer service for replacement parts.

Warnings and Cautions

1of2

Assembly Instruction Sheet #IS-MCRM2816PN

For Style MCRM2816PN

Bulb Recommended: (3) Medium Base 60W Maximum, Alternate bulb (3) 13W CFL

6 CORPORATE PARKWAY
GOOSE CREEK SC 29445
www quoizel com

,

.

.

.

Thank you for purchasing a Quoizel product.

Need assistance with parts or assembly? Call Quoizel customer service at 1-631-273-2700

or visit us on-line at www.quoizel.com

2014 QuoizelInc.

April2014

Turn off electricity at circuit breaker or main fuse box before installation. Consult a licensed electrician if in doubt.

These instructions are provided for your safety. It is very important you read them completely before installing the fixture. We strongly
recommend that a licensed, professional electrician perform the installation.

Disconnect fixture from power source before replacing bulbs. Make sure bulbs are given sufficient time to cool before removal. Do not subject
glass parts to any shock while in operation or shattering may result.

Package Contents

A

Hardware Contents

Ceiling
Canopy
x 1

AA

Crossbar Assembly
x 1

B

Lock Ball
x 2

GND

2.4mm
13Ga

QUOIZEL

R

C

6

” Rod

x 2

D

12

” Rod

x 2

STEP 1

Assemble Rods

-

A. Determine the Rods (C/D) to be

assembled to the Shade (E)
according to your hanging height.

B. Pass Supply Wires and Ground

Wire through the chosen Rods
(C/D) and then thread the chosen
Rods (C/D) and fixture together.
Hand tighten until snug.

C. Pass Supply Wires and Ground

Wire through the Ceiling Canopy
(A) and then thread the Ceiling
Canopy (A) and the Upper Rod
together. Hand tighten until snug.

C

D

A

E

Figure 1

E

Shade
x 1

F

Stem
x 1

G

Diffuser
x 1

H

Rubber
Washer
x 1

J

Hex Nut
x 1

K

Finial
x 1

STEP 2

Install Crossbar

-

.

.

A. Attach the Crossbar Assembly (AA) to the Outlet Box with the head

of the Green Ground Screw facing you. Secure it with Outlet Box
Screws (not included)

Tighten until snug

Figure 2

Outlet Box

Outlet Box Screw
(not included)

Green Ground Screw

AA

White wire

from supply

Ribbed side wire
from fixture

Black wire from
supply (or Red)

Smooth side wire
from fixture

Ground wire

from supply

Ground wire
from fixture

Figure 3

STEP 3 - Wire Connections

A. Use standard wire connectors (not included) to make all wire

connections. (Connectors are not included with fixture.) Strip and
prepare wire ends according to instructions supplied with
connectors.

B. Connect White Supply Wire from the Outlet Box to Ribbed side

Wire from fixture.

C. Connect Black (or Red) Supply Wire from the Outlet Box to Smooth

side Wire from fixture.

D. Connect Ground Wire from the Outlet Box to Ground Wire from

fixture.

E. Twist connectors until wires are tightly joined together.
F. Wrap each connection with approved electrical tape and carefully

stuff all the connected wires into the Outlet Box.

STEP 4

Attach Fixture Body to Mounting Screw

-

A. Place the Backplate of the Fixture Body (A) over the Mounting

Screws and secure with Lock Ball (B). Hand tighten until snug.

Figure 4

A

B

Mounting Screw

I

Flat
Washer
x 1

Advertising