Quoizel TFST2822VB Stephen User Manual

Care of tiffany style shade, Warnings and cautions, Package contents

Advertising
background image

1of3

Thank you for purchasing a Quoizel product.

Need assistance with parts or assembly? Call Quoizel customer service at 1-631-273-2700

or visit us on-line at www.quoizel.com

2014 QuoizelInc.

August2014

Care of Tiffany Style Shade

A new tiffany lamp shade has an oil film applied to the shade that protects the tiffany shade from scratches during shipment. If the oil applied is
too heavy you can remove the excess oil film with a paper towel. Gently wipe away the excess oil.

For general cleaning of tiffany shades use a gentle lemon oil-based furniture polish applied to a soft cloth and wipe gently.

If a white powder appears on the soldered joints of the tiffany shade this is a normal oxidation process. Use a small amount of lemon oil or
mineral oil applied directly to oxidized areas and the soldered area will return to like new.

Tools Required: Flathead screwdriver, Phillips screwdriver, pliers, wire cutters, wire strippers, electrical tape, safety glasses.
Bulb Recommended:
Estimated Assembly Time:
Preparation:

Medium Base

20-30 minutes

Identify and inspect all parts before beginning installation. Check package content list and diagrams below to be sure all parts are

present. If any parts are missing or damaged, do not attempt to assemble, install, or operate the fixture. Contact customer service for replacement
parts.

(4)

bulbs 100W Maximum, Alternate Bulb (4) 23W CFL

Warnings and Cautions

Assembly Instruction Sheet #IS-TFST2822VB

For Style TFST2822VB

Turn off electricity at circuit breaker or main fuse box before installation. Consult a licensed electrician if in doubt.

These instructions are provided for your safety. It is very important you read them completely before installing the fixture. We strongly
recommend that a licensed, professional electrician perform the installation.

Disconnect fixture from power source before replacing bulbs. Make sure bulbs are given sufficient time to cool before removal. Do not subject
glass parts to any shock while in operation or shattering may result.

Package Contents

A

B

C

D

F

E

Fixture Loop
x 1

Socket
Assembly
x 1

Side Arms
x 4

Center
Stem
x 1

Finial
x 1

Shade
x 1

Hardware Contents

AA

BB

CC

DD

EE

FF

II

Crossbar
x 1

Lock Washer
x 2

Hex Nut
x 2

Nipple
x 1

Canopy Chain
Loop
x 1

Canopy Lock Ring
x 1

Ceiling Canopy
x 1

GG

Fixture Chain
x 1

HH

Quick Link
x 2

STEP 1

Install Fixture Loop

-

A. Thread the Fixture Loop (A) onto the

nipple on the top center of the Socket
Assembly (B). Hand tighten until snug.

Figure 1

A

B

STEP 2

Install Shade

-

Quoizel recommends (2) people for this step.

A. Thread the hex nut end of the Center Stem

(D) into the hex coupling on the bottom center
of the Socket Assembly (B). Hand tighten until
snug.

B. Place the Shade (F) over the end of the

Center Stem (D). With one person hold the

Figure 2

F

C

D

E

B

Loop

Loop

Shade (F), another person attach one
end of the Side Arm (C) to the Loop at
the Socket Assembly (B) and attach
another ends of the Side Arms (C) to
the Loops in the Shade (F).

C. Adjust the Knurled Nut on the Center

Stem (D) until it is flush to the Shade
(F). Thread the Finial (E) onto the end
of the Center Stem (D) to secure the
Shade (F). Hand tighten until snug.

Advertising