Installation instructions, Step 5, Step 6 – Quoizel GF1721AN Griffin User Manual
Page 3: Step 7, Step 8

INSTALLATION INSTRUCTIONS
STYLE NUMBER GF1721AN,GF1721PN
:
WHITE OR RIBBED
BLACK OR RED WIRE
(
)
FROM HOUSE
GROUND WIRE
GROUND WIRE
FROM HOUSE
FROM FIXTURE
WHITE OR RIBBED
FROM FIXTURE
FROM HOUSE
FROM FIXTURE
BLACK OR SMOOTH
STEP 5
:
*
(
)
.
.
.
(
)
(
)
.
(
)
(
).
.
.
Use Wire Connectors not supplied to connect the
wires
a
Connect the House Ground Wire to the Fixture Ground
Wire.
b
Connect the House White
or Ribbed
Wire to the
Fixture Supply Wire White or Ribbed Side .
c Connect the House Black or Red
Wire to the Fixture
Supply Wire Black or Smooth Side
d Wrap each connection with approved electrical tape and
carefully stuff all of the connected wires into the Outlet Box
STEP 6
:
.
a
Place the Ceiling Canopy onto Outlet Box aligning 2
holes in the Ceiling Canopy with 2 Mounting screws
threaded on the Crossbar and secure it against wall
with Mounting Balls
.
STEP 7
:
a
Screw the short nipple end of the Stem Assembly into the
Hex Coupling underside of the Socket Cluster. Hand
tighten until snug.
.
STEP 8
:
a. Pass the following components over the end of the Stem
Assembly in turn:
Flat Washer, Plastic Washer, Shade, Plastic Washer and
Flat Washer.
b. Thread the Hex Nut onto the end of the Stem Assembly and
tighten gently until snug to secure the above parts
together.
3 OF 4
Mounting Screw
Ceiling Canopy
Mounting Ball
Outlet Box
Stem Assembly
Socket Cluster
Hex Coupling
Stem Assembly
Flat Washer
Plastic Washer
Plastic Washer
Flat Washer
Hex Nut
Shade