Installation instructions, Step 5, Step 6 – Quoizel GF1721AN Griffin User Manual

Page 3: Step 7, Step 8

Advertising
background image

INSTALLATION INSTRUCTIONS

STYLE NUMBER GF1721AN,GF1721PN

:

WHITE OR RIBBED

BLACK OR RED WIRE

(

)

FROM HOUSE

GROUND WIRE

GROUND WIRE

FROM HOUSE

FROM FIXTURE

WHITE OR RIBBED

FROM FIXTURE

FROM HOUSE

FROM FIXTURE

BLACK OR SMOOTH

STEP 5

:

*

(

)

.

.

.

(

)

(

)

.

(

)

(

).

.

.

Use Wire Connectors not supplied to connect the

wires

a

Connect the House Ground Wire to the Fixture Ground

Wire.

b

Connect the House White

or Ribbed

Wire to the

Fixture Supply Wire White or Ribbed Side .

c Connect the House Black or Red

Wire to the Fixture

Supply Wire Black or Smooth Side

d Wrap each connection with approved electrical tape and

carefully stuff all of the connected wires into the Outlet Box

STEP 6

:

.

a

Place the Ceiling Canopy onto Outlet Box aligning 2

holes in the Ceiling Canopy with 2 Mounting screws
threaded on the Crossbar and secure it against wall
with Mounting Balls

.

STEP 7

:

a

Screw the short nipple end of the Stem Assembly into the

Hex Coupling underside of the Socket Cluster. Hand
tighten until snug.

.

STEP 8

:

a. Pass the following components over the end of the Stem

Assembly in turn:

Flat Washer, Plastic Washer, Shade, Plastic Washer and

Flat Washer.

b. Thread the Hex Nut onto the end of the Stem Assembly and

tighten gently until snug to secure the above parts
together.

3 OF 4

Mounting Screw

Ceiling Canopy

Mounting Ball

Outlet Box

Stem Assembly

Socket Cluster

Hex Coupling

Stem Assembly

Flat Washer

Plastic Washer

Plastic Washer

Flat Washer

Hex Nut

Shade

Advertising