Transport preparation, Warning – Wheatheart Portable Drive Over Pit User Manual

Page 18

Advertising
background image

4. T

RANSPORT

W

HEATHEART

- P

ORTABLE

D

RIVE

O

VER

P

IT

4.1. T

RANSPORT

P

REPARATION

10" & 13"

18

30686 R0

4.1. TRANSPORT PREPARATION

The Wheatheart Portable Pit is designed to be easily and conveniently readied

for transport. Follow this procedure when converting the machine from operating

to transport configuration.

Figure 4.1 Securing Ramps
1. Check the wheel bolt torque prior to transporting the unit. See Section 7.3.7.

for recommended torque values.

2. Check that tires are inflated to the manufacturer’s recommended pressure

prior to transporting the unit.

3. Install the jack. Lift the four drive-over ramps into the transport position and

secure the ramps together with the safety chains. Refer to Figure 4.1.

4. Remove the transport lock pins from their storage position in the transport

frame arms.

5. Raise the rear of the frame off the ground by extending the wheel lift

cylinders.

6. Install

the

transport lock pins (Figure 5.4). You may have to extend or retract

the wheel lift cylinders slightly to align the holes. Refer to Figure 4.2.

WARNING

To prevent serious injury, keep feet, hands,
and fingers clear of frame and cylinder tabs
when operating the transport cylinder.

WARNING

Stay clear of machine when raising or
lowering. Ensure others remain clear.

Advertising