1. Stop or shut down the power source immediately.
2. Stop the flow of material from the transport vehicle.
3. Correct the emergency before resuming work.

5.3.5. U

NLOADING

1. Set up the machine according to the instructions in Section 5.3.1.
2. Review the pre-start checklist in Section 5.3.2.
3. Position

the

transport vehicle for unloading. Ensure the tires are aligned with

the drive-over zone. Refer to Figure 5.6.

Figure 5.6 Align Truck with Pit
4. Drive the vehicle over the Portable Pit.
5. Align the vehicle’s discharge chute with either the center or side hopper. Start

the Portable Pit according to the instructions in Section 5.3.3.

6. Begin unloading material into the Portable Pit. Direct the flow of grain into the

hopper and keep the hopper full for maximum capacity.

5.3.6. C

LEANOUT

1. Remove any excess grain from on top and around the hopper.
2. Run the unit to clean out the majority of the grain.

NOTICE

Align the transport vehicle tires with the drive-over ramps.
Severe damage will occur to the Portable Pit if the vehicle
is not properly aligned.

NOTICE

Ensure your vehicle does not exceed 100000 lb (45400 kg)
GVW, with a maximum tire load of 6600 lb

(3000 kg).

Exceeding the maximum weight ratings may cause
structural damage to the Portable Pit.