Operation, transport, & maintenance, Operating procedure – Wheatheart GHR Augers Intake Hopper User Manual

Page 13

Advertising
background image

W

HEATHEART

- I

NTAKE

H

OPPER

3. O

PERATION

, T

RANSPORT

, & M

AINTENANCE

BH/GHR A

UGERS

3.1. O

PERATING

P

ROCEDURE

30735 R1

13

3. Operation, Transport, &

Maintenance

3.1. OPERATING PROCEDURE

Figure 3.1

1. For other auger-related placement instructions, please refer to your auger

operation manual.

2. Remove tow bar from hopper. Place auger/hopper in desired location (for

example, under a bin hopper). See Placement instructions in auger operator
manual.

3. Set the hopper to self-level by disconnecting transport channel at top end.
4. To clean out after use, remove the cleanout cover by removing the four 5/16”

nuts holding it in place and use a vacuum or other tool to clean out.

Advertising
This manual is related to the following products: