Maintenance procedures – Wheatheart GHR Augers Intake Hopper User Manual
Page 16

3. O
PERATION
, T
RANSPORT
, & M
AINTENANCE
W
HEATHEART
- I
NTAKE
H
OPPER
3.3. M
AINTENANCE
P
ROCEDURES
BH/GHR A
UGERS
16
30735 R1
Figure 3.4
I
F
MOVING
AUGER
BETWEEN
BINS
:
1. Ensure auger is empty and lower auger until stabilizer bar can be secured in
one of the holes with saddle pin and snap pin. Slowly move to only to an
adjacent bin. Or alternatively, if it is not possible to lower the auger, lift the
hopper and have a second person align and secure the stabilizer bar.
2. If required, re-attach tow bar to auger and move with tractor. Refer to Figure
3. Remove tow bar and position auger in desired location.
4. Disconnect stabilizer bar
at top end
and place saddle pin
back through hole
and secure with hairpin.
3.3. MAINTENANCE PROCEDURES
1. Frequently, or every eight hours of operation, open service door and grease
bushing the u-joint. Close door.