Assembly, Tube clamps and transition flight assembly – Wheatheart GHR Augers Intake Hopper User Manual

Page 7

Advertising
background image

W

HEATHEART

- I

NTAKE

H

OPPER

2. A

SSEMBLY

BH/GHR A

UGERS

2.1. T

UBE

C

LAMPS

AND

T

RANSITION

F

LIGHT

A

SSEMBLY

30735 R1

7

2. Assembly

Important: To make assembly process as convenient as possible, use of a lift crane or some

other equipment for lifting the lower tube of the auger is recommended. Support
discharge end of auger to prevent upending.

2.1. TUBE CLAMPS AND TRANSITION FLIGHT ASSEMBLY

Figure 2.1



1. For Retrofits: First remove existing flighting guard and transition flighting.
2. Connect

top

and

bottom tube clamp on lower tube with twelve 7/16" x 1-1/4"

bolts and locknuts, tighten securely.

Note:

Line tube clamp flange flush with end of lower tube.

WARNING Before continuing, ensure you have read and understand the relevant information
in the safety section. Safety information is provided to help prevent serious injury, death, or
property damage.

Advertising
This manual is related to the following products: