Assembly, Tube clamps and transition flight assembly – Wheatheart GHR Augers Intake Hopper User Manual
Page 7

W
HEATHEART
- I
NTAKE
H
OPPER
2. A
SSEMBLY
BH/GHR A
UGERS
2.1. T
UBE
C
LAMPS
AND
T
RANSITION
F
LIGHT
A
SSEMBLY
30735 R1
7
2. Assembly
Important: To make assembly process as convenient as possible, use of a lift crane or some
other equipment for lifting the lower tube of the auger is recommended. Support
discharge end of auger to prevent upending.
2.1. TUBE CLAMPS AND TRANSITION FLIGHT ASSEMBLY
Figure 2.1
1. For Retrofits: First remove existing flighting guard and transition flighting.
2. Connect
top
and
bottom tube clamp on lower tube with twelve 7/16" x 1-1/4"
bolts and locknuts, tighten securely.
Note:
Line tube clamp flange flush with end of lower tube.
WARNING Before continuing, ensure you have read and understand the relevant information
in the safety section. Safety information is provided to help prevent serious injury, death, or
property damage.