Point planter installation instructions – Great Plains 8030-3P Wide Row Planters User Manual

Page 8

Advertising
background image

3-Point Wide Row Planter Flat Fold Marker 113-519M

4/9/04

6

Great Plains Mfg., Inc.

Section 2 Assembly Instructions & Set-Up

3-Point Planter
Installation Instructions

NOTE: While using the following text to install your
flat fold marker, you may need to refer to the parts
section of this manual for more details and for posi-
tive identification of related items not mentioned in
these instructions.

Refer to Figure

2-1 for the following Installation

Instructions.

1.

Lower the planter to the planting position. Remove
the frame end cap if applicable.

2.

Install all hydraulic hoses to valve (#3 & 4). Install
the valve and marker hoses to the center mast of the
frame (#5, 6, 7). Mark the hoses that are attached to
C1,C2,R1,and R2 ports. (Masking tape attached to
cylinder end of the hose is adequate.) Feed the cyl-
inder end of the hoses into the frame making sure
C1 and R1 go to the left end of the frame And that C2
and R2 go to the right end of the frame. When the
hoses are completely installed there will be excess
hose that will be tucked back inside the frame when
the cylinder and mount are installed.

3.

Install the fittings (#2) into the cylinders noting that
the elbows will point to the base ends of the cylin-
ders. Install the hoses (#3) marked C1 and C2 to the
rod end of the cylinders and the hoses marked R1
and R2 to the base end of the cylinders.

13332

Hose Routing

Figure

2-1

Advertising