Great Plains 2515P Marker Option User Manual

Page 4

Advertising
background image

113-685M

3/19/2003

Great Plains Mfg., Inc.

Marker Option

4

Refer to Figure 6.

6.

Bolt chain pivot (13) to first marker section
with 3/8 x 3 1/4 inch bolt (14) and lock nut so
chain pivot pivots freely on bolt.

7.

Bolt chain bar (15) to third marker section with
the 3/8 x 1 1/2 inch bolt (16) and lock nut so
chain bar pivots freely on bolt.

8.

Connect marker chain (17) to chain bar and
chain pivot with utility clevis (18). With marker
disk adjusted for seeding width and disk
touching the ground, remove chain slack with
utility clevis nearest bean machine.

9.

Assemble full-threaded, 3/8 inch stop bolt
(19) and lock nuts on lift-arm extension (20)
so head of stop bolt extends as little as possi-
ble. After the marker is bled and folded, adjust
stop bolt to remove slack from chain. Refer to
Marker Chain Adjustments in the operator’s
manual.

Figure 6

Marker Chain Assembly

18536

Advertising
This manual is related to the following products: