Great Plains 2515P Marker Option User Manual

Page 5

Advertising
background image

3/19/2003

113-685M

Great Plains Mfg., Inc.

5

Installation Instructions

Carrier Assembly, 2015 and 2515

To assemble carrier onto bean machine frame, re-
fer to Figure 7. Refer to Table 1 for mounting
dimensions.

Figure 7

Transport Carrier Assembly

17796

Dimension

20-Foot

Bean Machine

25-Foot

Bean Machine

A

38 inches

55 1/2 inches

B

3 1/16 inches

2 5/8 inches

C

29 inches

36 3/8 inches

Table 1

Carrier Mounting Dimensions

1.

Assemble transport-carrier mount (1) on
bean machine frame. Center mount A inches
from outside end of bean machine frame. Use
1/2 x 6 1/32 x 7 inch
u-bolts (2), flat washers, lock washers and
hex nuts (3). Slide mount forward so its lead-
ing edge is about B inches ahead of front
edge of bean machine frame tube.

2.

Bolt transport carrier (4) to transport-carrier
mount so top surface of saddle (5) is about C
inches above top of bean machine frame
tube. Secure transport carrier with 1/2 x 2 x 3
inch u-bolts (6), lock washers and hex nuts
(7).

3.

After installing and bleeding hydraulics, trans-
port carrier may require further adjustment.
When folded, the second marker section
should rest in the transport-carrier saddle.
Refer to Marker Adjustments in the operator’s
manual.

Advertising
This manual is related to the following products: