Great Plains John Deere 750 20' Flat Fold Markers User Manual

Page 8

Advertising
background image

205-038M

3/20/2003

6

NOTE: While using the following text to install your
flat fold marker, you may need to refer back to the
parts section of this manual for more details and
for positive identification of related items not men-
tioned in these instructions.

Refer to Figure 1

1.

Lower the hitch to field position. Allow clear-
ance of minimum 9’ on a 15’ drill and 11’ on a
20’ drill from each end of the coulter tool bar
for marker assembly.

2.

Using the U-bolts (4) with flanged nuts (3), po-
sition the adapter mount (5) on the front edge
of the drill frame. Bolt the marker mount (1) to
the lower side of the adapter mount (5) using
bolts (2) and flanged nuts (3).

NOTE: The offset of the mount must be in the up-
ward direction.

Refer to Figure 2

3.

Install the marker valve mount (6) close to the
center hitch on the tool bar frame using the U-
bolt (10), bracket (11) and flange nut (12). As-
semble the valve (7) to the mount with the 4-
port side downward using two 3/8" x 3/4" long
bolts (8) and lock washers (9).

Figure 1

Assembly

Figure 2

Assembly

13349

13349

Advertising
This manual is related to the following products: