Reconnect marker sequence valve, Tie-wrap hoses, Undle at step 65. align them with that in – Great Plains Auxiliary Hydraulic Kit User Manual

Page 10

Advertising
background image

Great Plains Mfg., Inc.

10

Auxiliary Hydraulic Kit

401-466M

05/05/2009

Reconnect Marker Sequence Valve

Refer to Figure 20

57. Select two:

811-463C HH3/8R2 015 9/16FJIC 9/16FJIC

58. At the marker sequence valve

connect a hose

to the bottom Front port

. Tighten JIC fitting.

59. At the selector valve

, connect the other end of

that hose

to the bottom Front (marker) port

.

Tighten ORB and JIC fittings.

60. At the marker sequence valve

connect a hose

to the top Front port

. Tighten JIC fitting.

61. At the selector valve

, connect the other end of

that hose

to the top Front (marker) port

.

Tighten ORB and JIC fittings.

Tie-Wrap Hoses

62. Select the set of:

800-060C CABLE TIE .19X14.25 3DIA 50LB

63. Inspect the area at the selector/sequence valves,

and tie any hoses that appear at risk of chaffing or
getting caught in moving parts during folding/
unfolding and planting.

64. Fold the planter. This ensures correct hose length

at the wing pivot point.

65. Use the remaining ties to secure the new hoses

(

or

) along the seed hose bundle and rack.

Figure 20

Re-Connect Sequencer

25412

U

D

F

B

L

R

1

33

28

3

2

6

7

33

1

33

2

28

33

6

1

33

3

28

33

7

17

31

34

Advertising