Assemble and route auxiliary hoses, Ulkhead can be added at step 29 – Great Plains Auxiliary Hydraulic Kit User Manual

Page 5

Advertising
background image

Great Plains Mfg., Inc.

Installation Instructions

5

05/05/2009

401-466M

Refer to Figure 9, which is a view back, left and up into the seed cart
frame (with the airbox deleted for clarity)

28. Select one:

411-271D BULKHEAD HOSE MNT

29. Place the bulkhead

keyholes

over the rear

two loose nuts, and press it flush against the seed
cart frame

.

30. Slide the bulkhead

forward until all three narrow

openings are under the nuts

and washers

.

Tighten nuts.

Assemble and Route Auxiliary Hoses

Refer to Figure 10

31. Select two of each, per YP model:

YP1225:

811-204C CP 3/4FORB QD BH
841-365C HH3/8R2 300 9/16FJIC 3/4MORB

YP1625:

811-204C CP 3/4FORB QD BH
811-960C HH3/8R2 360 9/16FJIC 3/4MORB

32. Insert the male O-ring Boss (MORB) end of the

hydraulic hose (

or

) into the female O-Ring

boss (FORB) end of the coupler

. Tighten.

Refer to Figure 11

33. Route the hose ends with the couplers into the left

side of the seed box frame, from above the seed
tube rack. They will be tie-wrapped to the left seed
tube bundle at step 65. Align them with that in
mind.

Figure 9

Install Bulkhead

25402

44

41

20

3

13

1

1

U

D

B

F

L

R

26

13

13

1

3

13

41

44

Figure 10

Assemble Port Hoses

25403

31

32

34

32

31

32

34

31

34

32

Figure 11

Route Hoses into Seed Frame

25404

Advertising