Closeout – Great Plains Verti-Till Field Update User Manual

Page 17

Advertising
background image

Great Plains Manufacturing, Inc.

Closeout

17

08/06/2007

596-186M

Closeout

Refer to Verti-Till Operator’s manual.
84. Connect the Transport and Coulter lift circuits to the

tractor.

85. If the transport lift locks are not installed, carefully

extend the transport lift circuit to raise the implement
enough to install the locks.

86. Conduct the “Bleeding Transport Cylinders” proce-

dure from the Operator’s manual.

87. Check all hydraulic fittings for leaks.

88. Extend the Transport lift circuit and install the locks.

89. Lower the fork lift or dismount the implement from

the blocks or stands used to hold it up.

90. Remove the locks from Transport lift cylinders, and

exercise both lift circuits, checking for binding or
missing bolts at all hinge points.

91. Raise both circuits and install locks.

Advertising