Great Plains Manufacturing, Inc.

Replace Pin Retainers

5

08/06/2007

596-186M

Level Link Crank Pin Retainers

Refer to Figure 7 and Figure 8
Replace the retaining bolts and nuts of the upper four
pins in each of two triangular cranks

,

between the

frame and transport wheel rockshaft (not shown).

Note: The bolts in the lower end of the vertical links are

replaced on the next page.

Upper and Lower Link Pivots

14. Remove four sets of existing:

HHCS 3/8-16X2 1/2 GR5
NUT LOCK 3/8-16 PLT

These parts are not re-used.

15. Select four sets of new:

802-849C HHCS 3/8-16X3 1/4 GR8
803-013C NUT LOCK 3/8-16 PLT

Install the bolts in the pins.

Crank to Frame Pivots

Refer to Figure 8
Replace the retaining bolts and nuts of the main pivot
pins in each of the two triangular cranks between the
frame and transport wheel rockshaft (not shown).

Upper and Lower Link Pivots

16. Remove two sets of existing:

HHCS 3/8-16X3 1/4 GR5
NUT LOCK 3/8-16 PLT

These parts are not re-used.

17. Select two sets of new:

802-781C HHCS 3/8-16X3 1/2 GR8 PLT
803-013C NUT LOCK 3/8-16 PLT

Install the bolts in the pins.

U

D

F

B

L

R

Figure 7

Level Link Crank Links

21558

55 38

52 36

52 36

55 38

52 36

55 38

55 38

52

36

5

7

5

7

Inspect bolt heads before replacing.
If already grade 8, skip to next implement location.

52

55

36

38

U

D

F

B

L

R

Figure 8

Level Link Crank Pivot

21558

53 34

55 38

55 38

53

34

Inspect bolt heads before replacing.
If already grade 8, skip to next implement location.

53

55

34

38

Advertising