Display monitor – Great Plains Air-Pro Meter Ultra Test Stand Kit User Manual
Page 6
Advertising

6
Great Plains Manufacturing, Inc.
Air-Pro
®
Ultra Test Stand Kit
403-533M
09/27/2011
Refer to Figure 13
17. Make sure the top of the seed tube
is located
properly behind the drip apron.
Refer to Figure 14
18. Cut seed hose
1
1
⁄
2
in above the black molded
boot. Insert the funnel
and attach to top of seed in
port of the Air-Pro
®
meter. Refer to Figure 1 on
Null4:
Display Monitor
Confusion Risk:
Due to the direction of meter rotation program in the vacuum
mode, the display will show “Vacuum”
but the reading you
see is actually “PRESSURE IN INCHES OF WATER.”
Null4:
Figure 13
Top of Seed Tube
31069
6
6
Null4:
Figure 14
Funnel and Seed Hose
31086
Null4:
Figure 15
Seed Sense Display Monitor
31070
7
7
Advertising