Display monitor – Great Plains Air-Pro Meter Ultra Test Stand Kit User Manual

Page 6

Advertising
background image

6

Great Plains Manufacturing, Inc.

Front Page

Part Lists

Air-Pro

®

Ultra Test Stand Kit

403-533M

Front Page

Part Lists

09/27/2011

Refer to Figure 13
17. Make sure the top of the seed tube

is located

properly behind the drip apron.

Refer to Figure 14
18. Cut seed hose

1

1

2

in above the black molded

boot. Insert the funnel

and attach to top of seed in

port of the Air-Pro

®

meter. Refer to Figure 1 on

page 1.

Null4:

Display Monitor

Refer to Figure 15

Confusion Risk:
Due to the direction of meter rotation program in the vacuum
mode, the display will show “Vacuum”

but the reading you

see is actually “PRESSURE IN INCHES OF WATER.”

Null4:

Figure 13

Top of Seed Tube

31069

6

6

Null4:

Figure 14

Funnel and Seed Hose

31086

19

18

18

19

Null4:

Figure 15

Seed Sense Display Monitor

31070

7

7

Advertising