Bio-Rad Model 583 Gel Drying Supports User Manual

Page 9

Advertising
background image

2.3 BASIC OPERATION

Warning

Turn the vacuum line’s two-way valve to the closed position when the dryer
is not in use; the vacuum pump then can continue operating without foaming.

Table 4.

HydroTech Operation

Step

Procedure

Description

1.

Turn on the Power On/Off

Choose either “continuous on” by turning the knob

Timer switch.

counter-clockwise or “timer” by turning clockwise.
Maximum timed operation is 3 hours.

2.

Turn the vacuum line two-way

This prevents reservoir foaming when the vacuum is

valve to the Closed position.

running but the gel dryer is not in use.

3.

Position the gel in the gel dryer
and seal the gel dryer.

4.

Turn the vacuum line’s two-way

The pump will now pull a vacuum on the gel dryer.

valve to the Open position.

5.

When the gel is dry, break the

Lift the Sealing Gasket of the gel dryer. Keep the

vacuum seal.

vacuum pump running to prevent liquid in the vacuum
line from flowing back into the gel dryer.

6.

Turn the vacuum line’s two-way

This prevents reservoir foaming when the HydroTech

valve to the Closed position.

is running but the gel dryer is not in use.

7.

Turn off the HydroTech pump.

Set Up and Basic Operation

6

Advertising
This manual is related to the following products: