Edge Lighting Pre-Bent Monorail User Manual

Pre-bent monorail, Installation instructions for, Important information

Advertising
background image

SAVE THESE INSTRUCTIONS!

M-_R-_

- This product is ETL listed for indoor dry locations.
- Monorail is bendable horizontally to a radius as small as 6".
- The product is intended to be used with Edge Lighting
Monorail systems only.

Pre-Bent Monorail

Installation Instructions for

904-M-RCS-03

IMPORTANT INFORMATION

1718 W. Fullerton Ave

Chicago, IL 60614

Tel: 773-770-1195

Fax: 773-935-5613

www.edgelighting.com

[email protected]

M-_C-_

M-92S-_

1: Push the Monorail conductive connector pins completely into
one pre-bent Monorail section. Make sure this Monorail
section is secured with the standoffs (Refer to the
instructions provided with the standoffs).

2: Push the other pre-bent Monorail section completely onto
the Monorail straight conductive connector pins and
simultaneously connect the pre-bent Monorail to the
standoffs.

ONE PRE-BENT
MONORAIL SECTION

STRAIGHT
CONDUCTIVE
CONNECTORS

A

1

2

Connect the Pre-Bent Monorail Sections with the Conductive
Connectors

Connect the Pre-Bent Monorail
section with the Isolating
Connectors

2

B

ISOLATING CONNECTOR

ONE PRE-BENT MONORAIL SECTION

1

1: Push the straight isolating connectors completely into one
pre-bent Monorail section end. Make sure this pre-bent
Monorail section is secured with the standoffs (Refer
to the instructions provided with the standoffs).

1

© 2009 Edge Lighting. All Rights Reserved.

Advertising
Table of contents