Edge Lighting Pre-Bent Monorail User Manual

Page 2

Advertising
background image

2

C

THE OTHER PRE-BENT
MONORAIL SECTION

2

2: Push the other pre-bent Monorail section entirely onto the
isolating connectors and simultaneously connect the
pre-bent Monorail to the standoffs.

1/16 ALLEN
WRENCH

#6-32 SET SCREW

D

ISOLATING CONNECTOR

3: Tighten the #6-32 set screw on each of the isolating
connectors firmly with the 1/16 Allen wrench. Do not over
tighten the set screws as this may strip the threads.

3

3

E

1: For the Single Power Feed Connection- Use one set of
isolating connectors and the appropriate sets of conductive
connectors provided to connect the pre-bent Monorail
sections together as a circle.

Connecting a Pre-Bent Circle Sections

F

2: For the Dual Power Feed Connection- Use

sets of

isolating connectors and the appropriate sets of conductive
connectors provided to connect the pre-bent Monorail
sections together as a circle.

two

ISOLATING
CONNECTOR

CONDUCTIVE CONNECTOR

ISOLATING CONNECTOR

CONDUCTIVE CONNECTOR

ISOLATING CONNECTOR

CONDUCTIVE CONNECTOR

Advertising