Install the monorail 2 circuit to the transformer – Edge Lighting 2x150W/12V Dual Feed Surface Mount Magnetic Transformer User Manual

Page 4

Advertising
background image

4

CAP

3/8-24 SETSCREW

POWER HOUSING

1

2

MIDDLE
CONTACT

KNURLED
NUT

3

1: Unscrew the cap from the power housing.

2: Slightly loosen the 3/8-24 set screw on the cap with the
3/16 Allen wrench provided, DO NOT REMOVE IT.

3: Slightly loosen the knurled nut on the power housing so that
the middle contact moves back and clears the power housing
opening.

J

Install the Monorail 2 Circuit to the Transformer

K

CAP

POWER HOUSING

MONORAIL 2 CIRCUIT

L

CAP

6: Tighten the 3/8-24 set screw on the cap with the 3/16
Allen wrench for proper power connection.

7: Tighten the knurled nut for proper power connection.

7

KNURLED NUT

3/8-24 SET SCREW

3/16 ALLEN WRENCH

6

NOTE:

the Monorail 2 circuit while connecting Monorail 2 circuit to the
surface mount transformer (refer to the instructions provided with
the standoffs).

The proper size standoffs should be installed to support

4: Place the

into the power housing and

support it with the standoffs (refer to the instructions
provided with the standoffs).

5: Tighten the cap to the power housing. Make sure the cap
is not cross threaded.

Monorail 2 Circuit

4

4

5

SWITCH 1

M

SWITCH 2

HOT 1

HOT 2

COM

HOT 1

COM

NOTE:

Switch 2 turns on/off circuit 2 (COM & HOT 2). Load each circuit of
Monorail 2 Circuit to MAXIMUM 150 watt.

Switch 1 turns on/off the circuit 1 (COM & HOT 1) and

HOT 2

MONORAIL 2 CIRCUIT

Advertising