Rack Installation Guide

Rack Kit Contents

The two-post rack kit includes (see Figure 1-9):

One pair of mounting rails

12-24 x 0.5-inch pan-head Phillips screws (8)

Releasable tie wraps (2) (not shown in Figure 1-9)

Figure 1-9.

Two-Post Rack Kit Components

Installation Tasks

Installing a two-post rack kit includes performing the following tasks in order:

1

Marking the rack

Universal-hole spacing rack

Wide-hole spacing rack

mounting rails (2)

12-24 x 0.5-inch
pan-head Phillips
screws (8)

7.62-cm (3-inch) wide, flush-mount, threaded studs

flush-mount mounting flange

15.24-cm (6-inch) wide, flush-mount, threaded studs

center-mount mounting flange

7.62-cm (3-inch) wide, center-
mount, threaded studs

15.24-cm (6-inch) wide,
center-mount, threaded
studs

adjustable mounting flange