Assembly step 11 – CFM Corporation 3405BG User Manual

Page 15

Advertising
background image

15

Assembly Step 11

Tools needed:

Locate these parts:

Zip Tie

Hardware Bag

G

S-Hook

Pliers

Using the zip tie, secure the hose to the front
leg as shown. Do not pull the zip tie tight -
leave it just loose enough so the hose can be
adjusted if needed.
Tying the hose to the leg helps prevent the
hose from coming into contact with the hot
burner chamber. Inspect the installation
underneath the smoker to ensure the hose is
not rubbing any position of the burner cham-
ber.

Crimp

OR

1. Place one end of the S-hook around the

regulator neck or through the eyelet as
shown.

2. Using a set of pliers, crimp the S-

hook securely to the HVR so it
can not be removed from the
HVR.

3. When the LP tank is not at-

tached to the smoker, use the
S-hook to hang the HVR from
the carry handle on the side
of the smoker. This will help
prevent dirt and other par-
ticles from plugging the end
of the HVR.

Assembly is now complete! Please follow all instructions and safeguards
on the following pages for connecting the LP tank.

Advertising
This manual is related to the following products: