Rack-to-tower kit contents – Dell PowerVault 220S (SCSI) User Manual

Page 4

Advertising
background image

1-2

Rack-to-Tower Conversion Guide

w

w

w

.d

e

ll

.co

m

|

s

u

p

p

o

rt

.d

e

ll.c

o

m

• Before working on the rack, make sure that the stabilizers are secured to the rack,

extend to the floor, and that the full weight of the rack rests on the floor. Install front

and side stabilizers on a single rack or front stabilizers for joined multiple racks before

working on the rack.

• Always load the rack from the bottom up, and load the heaviest item in the rack first.
• Make sure that the rack is level and stable before extending a component from the

rack.

• Use caution when pressing the component rail release latches and sliding a component

into or out of a rack; the slide rails can pinch your fingers.

• After a component is inserted into the rack, carefully extend the rail into a locking

position, and then slide the component into the rack.

• Do not overload the AC supply branch circuit that provides power to the rack.

The total rack load should not exceed 80 percent of the branch circuit rating.

• Ensure that proper airflow is provided to components in the rack.
• Do not step on or stand on any system/component when servicing other

systems/components in a rack.

Rack-to-Tower Kit Contents

The rack-to-tower kit includes the following items (see Figure 1-1):

• One tower bezel, including keylock and keys
• One tower front panel
• One tower left-side cover
• One tower right-side cover
• One tower base assembly
• Four ¼-20 x 0.5-inch hex socket-head screws
• Four ¼ x 1 x 0.08-inch flat washers
• Two round covers

2H982bk1.book Page 2 Monday, November 5, 2001 10:12 AM

Advertising
This manual is related to the following products: