Installing the rail and the system – Dell PowerEdge C410x User Manual

Page 72

Advertising
background image

Removing and Installing Hardware | 72

Installing the Rail and the System

Follow these instructions to install the rail into a rack:

1. Install the sliding rails into the rack.

2. Align the inner rails with the sliding rails of the rack.

Advertising