Crown Boiler BWC151 User Manual

Page 13

Advertising
background image

10

11

FIGURE 1.11: EXPANSION LOOPS

TABLE 1.12: SUMMARY OF VERTICAL VENTING OPTIONS

VENT OPTION #

5

6

7

8

CLASSIFICATION USED IN THIS

MANUAL

VERTICAL

TWIN PIPE

VERTICAL

TWIN PIPE

VERTICAL

TWIN PIPE

VERTICAL

TWIN PIPE

ILLUSTRATED IN FIGURE

1.14

1.15

1.16

1.16

VENT PIPE PENETRATION

THROUGH STRUCTURE

ROOF

ROOF

ROOF

ROOF

AIR INTAKE PIPE PENETRATION

THROUGH STRUCTURE

ROOF

ROOF

ROOF

ROOF

VENT PIPE SIZE

3”

3”

3”

4”

AIR INTAKE PIPE SIZE

3”

3”

4”

4”

MAXIMUM LENGTH

VENT

BWC070

98ft

98ft

BWC090

98ft

98ft

BWC120

98ft

98ft

BWC151

98ft

98ft

BWC150

51ft

BWC225

49.5ft

INLET

BWC070

98ft

98ft

BWC090

98ft

98ft

BWC120

98ft

98ft

BWC151

98ft

98ft

BWC150

54.5ft

BWC225

54.5ft

MINIMUM LENGTH

VENT

BWC070

2ft

2ft

BWC090

2ft

2ft

BWC120

2ft

2ft

BWC151

2ft

2ft

BWC150

2ft

BWC225

2ft

INLET

BWC070

2ft

2ft

BWC090

2ft

2ft

BWC120

2ft

2ft

BWC151

2ft

2ft

BWC150

2ft

BWC225

2ft

VENT TERMINAL

COUPLING

CROWN

PN

230873

CONCENTRIC

TERMINAL

COUPLING

COUPLING

AIR INTAKE TERMINAL

180 ELBOW

180 ELBOW

180 ELBOW

VENT MATERIAL

CPVC + PVC

(Note #1)

CPVC + PVC

(Note #1)

CPVC + PVC

(Note #1)

CPVC + PVC

(Note #1)

AIR INTAKE MATERIAL

PVC

PVC

PVC

PVC

Note #1: First 30” and Elbow connected to boiler must be CPVC. Downstream vent pipe can be PVC, except as noted in text.