TABLE 1.5: CROWN CPVC/PVC VENTING COMPONENTS

CROWN PN

DESCRIPTION

USED ON

VENT

OPTION #

COMMENTS

230595

CPVC/PVC VENT KIT, BWC070/090/120/151

1,2,5,6

230596

CPVC/PVC VENT KIT, BWC150

3,7

230597

CPVC/PVC VENT KIT, BWC225

4,8

230873

PVC CONCENTRIC TERMINAL

2,6

Use with BWC070/090/120/151 Only

Note: BWC070/090/120/151 may be ordered with components in 230595 vent kit packaged inside the boiler

carton.

FIGURE 1.4: HORIZONTAL CPVC/PVC VENTING, BWC150/225 (Vent Option #3, 4)

Pitch of Horizontal Piping

4.

- Pitch all horizontal piping 1/4” per foot so that any condensate which forms in the

piping will run towards the boiler.

Supporting Pipe

5.

- Vertical and horizontal sections of pipe must be properly supported. Maximum support spacing is

four feet.

Allowing for Thermal Expansion

6.

- Design the vent system to allow 3/8” of thermal expansion for every 10ft of

CPVC/PVC pipe. The boiler will always act as an anchor to one end of the vent system. If at all possible, select and

install hangers and wall thimbles so that the vent system can expand towards the terminal. When a straight run of

pipe exceeds 20ft and must be restrained at both ends, an offset or expansion loop must be provided (

Figures 1.11a,

1.11b).

When a straight horizontal run of pipe exceeds 20ft and is restrained at one end with an elbow at the other,

avoid putting a hanger or guide less than “Y” inches from the elbow in the adjoining straight section (Figure 1.11c).

Thermal expansion fittings are not permitted.