Crown Boiler BWC151 User Manual

Page 5

Advertising
background image

2

3

TABLE 1.1: SUMMARY OF HORIZONTAL VENTING OPTIONS

VENT OPTION #

1

2

3

4

CLASSIFICATION USED IN THIS

MANUAL

HORIZONTAL

TWIN PIPE

HORIZONTAL

TWIN PIPE

HORIZONTAL

TWIN PIPE

HORIZONTAL

TWIN PIPE

ILLUSTRATED IN FIGURE

1.2

1.3

1.4

1.4

VENT PIPE PENETRATION

THROUGH STRUCTURE

WALL

WALL

WALL

WALL

AIR INTAKE PIPE PENETRATION

THROUGH STRUCTURE

WALL

WALL

WALL

WALL

VENT PIPE SIZE

3”

3”

3”

4”

AIR INTAKE PIPE SIZE

3”

3”

4”

4”

MAXIMUM LENGTH

VENT

BWC070

100ft

100ft

BWC090

100ft

100ft

BWC120

100ft

100ft

BWC151

100ft

100ft

BWC150

55ft

BWC225

55ft

INLET

BWC070

100ft

100ft

BWC090

100ft

100ft

BWC120

100ft

100ft

BWC151

100ft

100ft

BWC150

60ft

BWC225

60ft

MINIMUM LENGTH

VENT

BWC070

2ft

2ft

BWC090

2ft

2ft

BWC120

2ft

2ft

BWC151

2ft

2ft

BWC150

2ft

BWC225

2ft

INLET

BWC070

2ft

2ft

BWC090

2ft

2ft

BWC120

2ft

2ft

BWC151

2ft

2ft

BWC150

2ft

BWC225

2ft

VENT TERMINAL

TEE (Note #1)

CROWN

PN

230873

CONCENTRIC

TERMINAL

TEE (Note #1)

TEE (Note #1)

AIR INTAKE TERMINAL

TEE (Note #1)

TEE (Note #1)

TEE (Note #1)

VENT MATERIAL

CPVC + PVC

(Note #2)

CPVC + PVC

(Note #2)

CPVC + PVC

(Note #2)

CPVC + PVC

(Note #2)

AIR INTAKE MATERIAL

PVC

PVC

PVC

PVC

Note #1: TEEs may be offset on snorkels as shown in Figure 1.10

Note #2: First 30” and Elbow connected to boiler must be CPVC. Downstream vent pipe can be PVC, except as noted in text.

Advertising
This manual is related to the following products: